Method statement - brickworkIf you're managing a brickwork job, you need to make sure that those involved are safe. However, you don't need overly long or complex paperwork to achieve this. Clear guidanceThis method statement specifies the activities t... Read more
04 Oct 2019
Credits: 1
doc
Procedure
Method statement - blockworkBecause of the risks associated with building a block wall, e.g. manual handling, exposure to chemicals etc., you must identify the safe systems of work that your staff should follow.  What to do?If you're building a block... Read more
27 Nov 2019
Credits: 1
doc
Procedure
Method statement - installing MMMF insulationBecause of the risks associated with working with insulation, e.g. manual handling, skin burns and irritation, breathing difficulties etc., you must identify the safe systems of work that your staff should... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - paint strippingBecause of the risks associated with stripping paint, e.g. manual handling, exposure to potentially hazardous substances, dust, debris etc., you must identify the safe systems of work that your staff should follow. ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - laying a hot lay tarmac pavementBecause of the risks associated with laying a pavement, e.g. manual handling, the use of plant and machinery, hot work, exposure to hazardous substances etc., you must identify the safe systems of wo... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - installing copper pipeworkBecause of the risks associated with installing copper pipework, e.g. manual handling, hot work, working in confined spaces etc., you must identify the safe systems of work that your staff should follow. ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - concreteBecause of the risks associated with concrete, you must identify the safe systems of work that your staff should follow before work is carried out.  What to do?To ensure that you give your staff sufficient practical guidan... Read more
16 Jan 2023
Credits: 1
doc
Procedure
Method statement - renderingIt's important that those who render walls are made aware of the safe systems of work to be followed. You can achieve this with our method statement. What to doThis Method Statement - Rendering specifies the activities to b... Read more
09 Jan 2020
Credits: 1
doc
Procedure
Method statement - demolition asbestos surveyBecause of the risks associated with asbestos, you must identify the safe systems of work that your staff should follow before a survey is carried out.  What to do?To ensure that you give your staff suffi... Read more
13 Jan 2023
Credits: 1
docx
Document
Method statement - paint stripping (using a heat gun)If your workers use heat guns when paint stripping, there are various hazards to be managed including the potential for a fire to take hold. Use our method statement to lessen the risk.sdsOur Metho... Read more
08 Nov 2021