Topic: Risk assessment

Order by: 
Filter by:
doc
Procedure
Method statement - installing a WC systemBecause of the risks associated with installing a WC system, e.g. manual handling, water being held under pressure etc., you must identify the safe systems of work that your staff should follow.  What to do?I... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - laying a hot lay tarmac pavementBecause of the risks associated with laying a pavement, e.g. manual handling, the use of plant and machinery, hot work, exposure to hazardous substances etc., you must identify the safe systems of wo... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - installing replacement PVC doorsBecause of the risks associated with fitting doors, e.g. manual handling, the use of handtools, dust, debris etc., you must identify the safe systems of work that your staff should follow.  What to ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - underground service detectionBecause of the risks associated with service detection, e.g. electric cable and gas pipe strikes following excavation, you must identify the safe systems of work that your staff should follow.  What to... Read more
02 May 2012
Credits: 1
doc
Form
Safe startIf the activities on your site change regularly, you need to ensure that your staff are kept in the loop. Achieve this with our safe start document. Just ten minutesThe safe start briefing isn't meant to take long. Its aim is to get all your... Read more
18 Dec 2015
Credits: 1
docx
Procedure
Method statement - post and rail fence erectionBecause of the risks associated with putting up a fence, e.g. manual handling, the use of plant and machinery, working near the edges of an excavation etc., you must identify the safe systems of work tha... Read more
05 May 2023
Credits: 1
doc
Procedure
Method statement - foul water drainsBecause of the risks associated with foul water drains, you must identify the safe systems of work that your staff should follow before work is carried out.  What to do?To ensure that you give your staff sufficien... Read more
16 Jan 2023
Credits: 1
doc
Procedure
Method statement - providing temporary electrical installations on construction sitesBecause of the risks associated with electrical systems, e.g. electric shock, you must identify the safe systems of work that your staff should follow.  What to do?... Read more
05 Oct 2018
Credits: 1
doc
Procedure
Method statement - fitting an external hardwood door and frameBecause of the risks associated with fitting doors, e.g. manual handling, the use of handtools, dust, debris etc., you must identify the safe systems of work that your staff should follow.... Read more
23 Dec 2011
Credits: 1
docx
Policy
GDPR data protection policyOur data protection policy statement reiterates the important data protection principles set out in the UK GDPR, outlines out how you intend to comply with them and clarifies what rights and obligations an employee has both... Read more
11 Feb 2022
Credits: 1