Documents related to 'Method statement - excavations under 1.2 metres'

Order by: 
doc
Procedure
Method statement - excavations over 1.2 metresBecause of the risks associated with excavations, e.g. manual handling, trench collapse, service strikes etc., you must identify the safe systems of work that your staff should follow.  What to do?If you... Read more
23 Dec 2011
Credits: 1
doc
Form
Method statement - garden preparationBecause of the risks associated with garden landscaping you must identify the safe systems of work that your staff should follow.  What to do?To ensure that you give your staff sufficient practical guidance on ho... Read more
06 Apr 2020
Credits: 1
doc
Procedure
Method statement - reinstating excavationsBecause of the risks associated with removing materials from excavations, e.g. manual handling, the use of plant and machinery, working near the edge of the excavation etc., you must identify the safe systems... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - foul water drainsBecause of the risks associated with foul water drains, you must identify the safe systems of work that your staff should follow before work is carried out.  What to do?To ensure that you give your staff sufficien... Read more
16 Jan 2023
Credits: 1
doc
Procedure
Method statement - tree felling using a chainsawBecause of the risks associated with chainsaws, e.g. serious lacerations, manual handling, falling trees etc., you must identify the safe systems of work that your staff should follow.  What to do?If y... Read more
02 May 2012
Credits: 1
doc
Procedure
Method statement - removal of excavated materialsBecause of the risks associated with removing materials from excavations, e.g. manual handling, the use of plant and machinery, working near the edge of the excavation etc., you must identify the safe ... Read more
02 May 2012
Credits: 1
doc
Procedure
Method statement - use of mechanical excavatorBecause of the risks associated with mechanical excavators, e.g. working near the edge of the excavation, moving machinery parts, cable strikes etc., you must identify the safe systems of work that your s... Read more
11 Jun 2012
Credits: 1
doc
Procedure
Method statement - temporary hoarding erectionBecause of the risks associated with erecting temporary hoarding to protect your site, e.g. manual handling, working on roads, the use of handtools etc., you must identify the safe systems of work that yo... Read more
02 May 2012
Credits: 1
doc
Procedure
Method statement - use of forward tipping dumpersBecause of the risks associated with driving a dumper, e.g. overturning, working in areas with pedestrians, working next to deep excavations etc., you must identify the safe systems of work that your s... Read more
11 Jun 2012
Credits: 1
doc
Document
Permit to work - excavationCarrying out excavation work is potentially dangerous. So to avoid or sufficiently reduce the risks to an acceptable level, use our permit to help you plan the work before it starts.Excavation workThe main dangers of excava... Read more
31 Jan 2017
Credits: 1