Documents related to 'Method statement - reinstating/laying paving slabs'

Order by: 
doc
Procedure
Method statement - laying a hot lay tarmac pavementBecause of the risks associated with laying a pavement, e.g. manual handling, the use of plant and machinery, hot work, exposure to hazardous substances etc., you must identify the safe systems of wo... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - brickworkIf you're managing a brickwork job, you need to make sure that those involved are safe. However, you don't need overly long or complex paperwork to achieve this. Clear guidanceThis method statement specifies the activities t... Read more
04 Oct 2019
Credits: 1
doc
Procedure
Method statement - blockworkBecause of the risks associated with building a block wall, e.g. manual handling, exposure to chemicals etc., you must identify the safe systems of work that your staff should follow.  What to do?If you're building a block... Read more
27 Nov 2019
Credits: 1
doc
Procedure
Method statement - renderingIt's important that those who render walls are made aware of the safe systems of work to be followed. You can achieve this with our method statement. What to doThis Method Statement - Rendering specifies the activities to b... Read more
09 Jan 2020
Credits: 1
doc
Procedure
Method statement - tree felling using a chainsawBecause of the risks associated with chainsaws, e.g. serious lacerations, manual handling, falling trees etc., you must identify the safe systems of work that your staff should follow.  What to do?If y... Read more
02 May 2012
Credits: 1
doc
Procedure
Method statement - concreteBecause of the risks associated with concrete, you must identify the safe systems of work that your staff should follow before work is carried out.  What to do?To ensure that you give your staff sufficient practical guidan... Read more
16 Jan 2023
Credits: 1
doc
Ra
Laying paving slabs and kerbs Laying paving slabs and kerbs may present risks to staff, especially through manual handling. Left unmanaged, these could cause accidents, injuries and potentially put you on the wrong side of the law.  Managing the ris... Read more
23 Nov 2016
Credits: 1
doc
Procedure
Method statement - delivery of materialsBecause of the risks associated with delivery vehicle movements, e.g. staff becoming trapped or run over, working in loading bays etc., you must identify the safe systems of work that your staff should follow.Â... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - underground service detectionBecause of the risks associated with service detection, e.g. electric cable and gas pipe strikes following excavation, you must identify the safe systems of work that your staff should follow.  What to... Read more
02 May 2012
Credits: 1