Safe systems of work - Method statements




Order by:
Filter by:
doc
Procedure
Method statement - reinstating excavationsBecause of the risks associated with removing materials from excavations, e.g. manual handling, the use of plant and machinery, working near the edge of the excavation etc., you must identify the safe systems... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - paint strippingBecause of the risks associated with stripping paint, e.g. manual handling, exposure to potentially hazardous substances, dust, debris etc., you must identify the safe systems of work that your staff should follow. ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - flushing and disinfection of new hot and cold water systemsBecause of the risks associated with disinfecting a water system, e.g. manual handling, the use of hazardous substances etc., you must identify the safe systems of work tha... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - excavations over 1.2 metresBecause of the risks associated with excavations, e.g. manual handling, trench collapse, service strikes etc., you must identify the safe systems of work that your staff should follow.  What to do?If you... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - installing copper pipeworkBecause of the risks associated with installing copper pipework, e.g. manual handling, hot work, working in confined spaces etc., you must identify the safe systems of work that your staff should follow. ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - handling and stacking of materialsBecause of the risks associated with handling and stacking of materials, e.g. physical injury cased by excessive manual handling, stock collapsing, etc., you must identify the safe systems of work ... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - installing MMMF insulationBecause of the risks associated with working with insulation, e.g. manual handling, skin burns and irritation, breathing difficulties etc., you must identify the safe systems of work that your staff should... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - controlling dust on construction sitesBecause of the risks associated with dust generated on a construction site, e.g. breathing difficulties etc., it's vital that they are controlled.  However, in order for this task to be complet... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - delivery of materialsBecause of the risks associated with delivery vehicle movements, e.g. staff becoming trapped or run over, working in loading bays etc., you must identify the safe systems of work that your staff should follow.Â... Read more
23 Dec 2011
Credits: 1
doc
Procedure
Method statement - drilling into ceramic tilesBecause of the risks associated with drilling into tiles, e.g. dust, flying debris, hitting a buried cable or pipe etc., you must identify the safe systems of work that your staff should follow.  What to... Read more
23 Dec 2011
Credits: 1