Documents related to 'Permit to work - contractor management'

Order by: 
doc
Form
Permit to work - CDMIf you're having construction works completed on your premises, make it clear who is in control of the site with our document.Over to youThe Construction (Design & Management) Regulations 2015 state that those managing construction... Read more
11 Feb 2020
Credits: 1
doc
Document
Permit to work - hazardous areaIf you have really significant hazards on your premises, you need to be absolutely sure that any contractors stay out of trouble. Use our permit to work to make your requirements clear.In harm's wayContractors are partic... Read more
05 Oct 2016
Credits: 1
doc
Form
Permit to work - non-energised circuitsWhen working on an electrical system that should be isolated you need to prevent it from being switched back on. You can do this by following a permit-to-work system.How to use the formOur permit to work is spli... Read more
05 Dec 2014
Credits: 1
doc
Checklist
Site setup checklistWhen you start a construction project, there are many issues to consider - not least ticking the health and safety boxes. To ensure you don't overlook anything important, use our checklist.So many things to rememberWhen you set up ... Read more
30 Jan 2018
Credits: 1
doc
Form
Permit to work - energised circuitsWork completed on electrical installations should be controlled with the use a permit-to-work system. This is of great importance when the work in question is on a live system. Manage the risksOur permit to work set... Read more
27 Oct 2011
Credits: 1
doc
Procedure
Method statement and risk assessmentSo that your staff and others are made aware of the safe systems of work to be followed on your construction project, set them out in a method statement. This should be supported with a risk assessment. What's  cov... Read more
26 Oct 2012
Credits: 1
doc
Form
Permit to work - lift shaftsWhen contractors or in-house staff work in the lift pit or on top of the lift car, there are some obvious and serious risks. Control the work by using our permit to work - lift shafts document.Who should use it?The permit ... Read more
03 Jan 2012
Credits: 1
doc
Form
Permit to work - machinery isolationWhen machines are taken apart, guards removed, isolation beams switched off, etc. risk levels increase significantly. To reduce them appropriately, such works should be controlled with a permit to work. In the dang... Read more
03 Apr 2017
Credits: 1
ppt
Flow Chart
Flow chart - contractor managementYou have chosen a contractor to complete construction work and you're starting to plan how the work will take place. Our flow chart will ensure that you fulfil your client duties under health and safety legislation.Wh... Read more
06 Apr 2018
Credits: 1
doc
Document
Request for pre-construction informationConstruction work clients should proactively send out pre-construction information, but what should you do as a contractor if they don't know this? Rather than struggle on, use our document.The lawThe duty to pr... Read more
21 Dec 2016
Credits: 1